Partner with MTLI on your next project todayBook a Call

    Industrial Renovations

    Keep your operations running while we upgrade your facility. MTLI Group specializes in phased renovation projects that improve efficiency without costly downtime.

    300+
    Renovations Completed
    85%
    Projects Done in Phases
    Zero
    Operations Shutdowns
    40+
    Years Experience
    Why Choose Us

    The MTLI Advantage

    • Phased renovation to maintain operations
    • Upgrade aging infrastructure cost-effectively
    • Improve energy efficiency and sustainability
    • Expand capacity within existing footprint
    • Modernize for automation integration
    • Ensure code compliance and safety updates

    Building Expansions

    Add square footage with clean integration with existing structures.

    Floor Upgrades

    Replace or resurface floors to support heavier equipment and traffic.

    Dock Modernization

    Upgrade loading docks with new levelers, doors, and safety equipment.

    Clear Height Increases

    Raise rooflines to accommodate taller racking and automation systems.

    Fire System Upgrades

    Modernize sprinkler systems for in-rack or high-pile storage compliance.

    Electrical Infrastructure

    Upgrade power capacity for automation and growing operational demands.

    Our Process

    How We Work

    01

    Facility Assessment

    Evaluate current conditions and identify improvement opportunities.

    02

    Phasing Strategy

    Develop a renovation plan that maintains ongoing operations.

    03

    Design & Engineering

    Create detailed plans that work within existing constraints.

    04

    Phased Construction

    Execute renovations in planned phases with minimal disruption.

    05

    Systems Integration

    Integrate new systems with existing infrastructure.

    06

    Transition Support

    Help operations transition to renovated spaces smoothly.

    Success Story

    400,000 SF Distribution Center Modernization

    "MTLI renovated our 25-year-old facility while we maintained full operations. The phased approach meant zero shutdowns, and we gained 40% more storage capacity through taller racking and optimized layouts."

    , Facilities Director, 3PL Provider

    Common Questions, Answered

    Can this work be done while our facility keeps operating?

    Yes, and that is where MTLI does most of its construction. We phase around your peak hours, run off-shift and weekend crews, and contain dust and debris so product and people stay protected.

    Do you handle drawings, permits, and inspections?

    End to end: layouts, stamped structural drawings, permit applications, and every inspection through to occupancy. One point of contact instead of chasing engineers and expediters separately.

    What delivery model fits this scope?

    Your choice: general contracting from your drawings, construction management with open-book costs, or full design-build turnkey. Concrete and structural steel are self-performed by our own crews either way.

    How do I get a real number for this work?

    Book a call. A construction specialist walks the scope with you, and you get an engineered proposal with a real number, from under $100K repairs to $100M+ turnkey builds.

    Ready to Get Started?

    Contact our team today for a free consultation and customized quote.

    Cookie Preferences

    We use cookies to enhance your browsing experience and analyze site traffic.